I'm still working on making pink washcloths with the cone of pink cotton yarn. My goal is to finish the cone up before this month is over. I have 9 made from it so far and working on the 10th.
I did put re-binding the blue and peach quilt in my OPAM 2015 list (see sidebar), but I want the washcloths to be my main finished project for this month.
I was able to get in some working time on the pink hexagons that are my pink for the soscrappy challenge in February (see button at the bottom of my post). I will also be working on these at my needlers group this afternoon. I'm trying to do a pattern on this one over just random.
I'm happy that I got this much done considering how busy I've been outside of the house. Outside sewing groups really help me!
UFO's:
Rectangle quilt
challenge wall hanging
GoodNight Irene quilt/wall hanging
Yo-Yo Table runner
Emerald Island Fusique table runner
Five and Dime quilt
Fractured Pineapple quilt
Charming Stars quilt
Brown half square triangle quilt
5 sets of doll blanket, pillows and rug
Hexagon flower table runner
Blue hexagon table topper
Pink hexagon table topper
2015 Finishes:
Locker Hook Rug
re-do binding on blue and peach patchwork
I am linking up with the following blogs:



0 comments:
Post a Comment